News

Launch update: First production parts arrive in UK

Hose pipe attached to an Impact Pump fitting

We have taken delivery of the first batches of production parts in preparation for assembly, quality assurance, packing and shipping. This is an important step in our preparations for getting the Impact Pump to market.

UK assembly

We are setting up our UK based assembly line for our first 200 units. This is to design, test and optimise assembly procedures to ensure the highest quality product possible.

Our award-winning technology has been developed in collaboration with: